Digging Down To Stuck Seattle Tunnel Machine

SEATTLE (AP) — The Transportation Department says help is on the way for a massive machine that became stuck last month while boring a tunnel under downtown Seattle.

The department said crews started drilling 5-foot wide shafts Tuesday in front of the machine known as Bertha.

The shafts should allow workers to remove a metal pipe in front of the machine and assess any other problems.

The machine ground to a halt on Dec. 6 after running into the 8-inch diameter pipe that had been left in the ground in 2002 after the department checked groundwater in the area.

Bertha is stopped about 60 feet underground and one-tenth of the way toward completing a 1.7-mile tunnel. It will carry Highway 99 traffic and allow the removal of the Alaskan Way Viaduct.

Copyright 2014 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

Comments

One Comment

Leave a Reply

Fill in your details below or click an icon to log in:

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

More From CBS Seattle

DOWNLOAD IT NOW!
Watch Danny Bonaduce On DANNY TV

Listen Live